29/11/2007 by Martin Sargent.
The swimming pool has been topped up, the fountain works very well and all the pool lights are now working.
I have moved the Heat pump and we are running the final checks for everything.
Posted in Pools - Heating, Pools - Finished, Pools - Under Construction, Client - Ron | 1 Comment »
17/11/2007 by Martin Sargent.
The pool is now finished and we are starting to fill it with water. The filter has been filled with sand and we have plumbed in the heat pump leaving plenty of long lengths of tubing for the future instillation of a salt chlorinator. The electrician will finish off on Monday morning and i am getting him to put the light switch in the sitting room, to turn on the new outside lights, that the ones next to the BBQ, the spots and the lower wall lighting, there is room for one more switch next to the existing one.
Posted in Pools - Under Construction, Client - Ron | No Comments »
13/11/2007 by Martin Sargent.
The glassing is now finished.
We will tile the pool edge tomorrow and I will start to fill the swimming pool with water this weekend I will also Install the heat pump.
The ramp to the garage is also finished.
The non slip is on all steps and swimming pool surround.
Posted in Pools - Under Construction, Client - Ron | No Comments »
25/10/2007 by Martin Sargent.
The water feature is nearly finnished.
Posted in Pools - Under Construction, Client - Ron | No Comments »
20/08/2007 by Martin Sargent.
The backfill is now in and we have vibrated the soil with a compactor, then laid down a steel mesh with steel reinforcing bars with the screed on top.

The picture below has the man pointing out the shower drain to the left of the gate way.

I think 4 blocks high around the pool is enough but it might be sensible to raise the BBQ area at least 2 or 3 more block for wind protection. I will also install two low plug sockets on the BBQ wall.
Posted in Pools - Under Construction, Client - Ron | No Comments »
14/08/2007 by Martin Sargent.
The walls for the terrace are now in, tomorrow is a fiesta so will backfill on Thursday, then it will start to look like a pool.
The block work is seperated every few meters with a reinforced column for added strength this is also connected to the foundations

Posted in Pools - Under Construction, Client - Ron | No Comments »
11/08/2007 by Martin Sargent.
Hi Ron,
Here are some up to date pictures of the pool.

Water was delivered on Monday so work is cracking on again.
Water pump is fine.
The steel has been put in the pool base and the copper wire for the earth has been soldered to it with two one metre copper spikes driven in to the ground to insure a good earth for the electrics.
Each layer of blocks has a 12mm thick ring of metal going through it, the blocks are hollow and then filled with concrete. So in effect the blocks work as a shuttering for the steel and concrete walls of the swimming pool.
I have put in the two swimming pool lights, five inlet jets for the return of the water after filtration, two skimmers, the sump and an extra connection for cleaning the pool. I have added this because, through experience, it´s much easier to clean the pool using a separate connection rather than using the skimmer (better suction).
Could you let me know what shape pool stairs you would like. e.g. curved or square?
Posted in Pools - Under Construction, Client - Ron | No Comments »
31/07/2007 by Martin Sargent.
We finished pouring the swimming pool base last Thursday and have now started the block work which is now at the half way stage.
I have had to pull the men off the job for a few days as we have just been hit by a sirocco (hot winds from Africa) The temp reaches 110 degrees in the shade by about 11.30 am.
I am aiming to have completed the swimming pool structure and plumbing by Saturday, weather permitting.
Posted in Pools - Under Construction, Client - Ron | No Comments »
13/07/2007 by Martin Sargent.
Had a good day with no complications, digger just squeezed through and most importantly we managed to dig down to the required pool depth without hitting rock. There was no electrics on site so I brought down the generator to give us power for the water pump. Had to dampen down to reduce the dust for the neighbours.

Stage 1 completed.
Now I am going to wash the dust off……

Posted in Pools - Under Construction, Client - Ron | No Comments »
07/07/2007 by Martin Sargent.
Latest photos
Starting to look like an Infinity pool.

This pool has an aljibi (water tank) on one side and the pump house on the other, it has been built on a reinforced 400mm thick steel and concrete
base as it is built on reclaimed land.
Infinity pools, also known as negative edge pools, are pools built so that the edge of the water blends into the horizon.
Posted in Pools - Under Construction, Client - Sue | 1 Comment »