Archive for the Current construction projects Category

Builders Lanzarote - New villa construction.

We have now started to lay the blocks for the first villa and it is starting to take shape.

Builders Lanzarote Natura Design New Villa build by Natura Design

This is the view from the back of the villa where you can see the shapes of the rooms.

Lanzarote builders natura-design-lanzarote-builders0105.jpg

Lanzarote Builders - Playa Blanca, roofing the sotano.

Natura design. Lanzarote builders of Luxury villas and custom built swimming pools.

The floors are being laid for the second villa’s basement and the water tanks are now finished.
builders-lanzarote.jpg Natura Design Water Tanks

This is the technical control checking the steel work for the roof and also taking samples of the concrete which they take back to the lab to check the quality. They follow the build from start to finish making sure the project is built exactly according to the plans and the quality of the materials used are of European standard for the seguro decenal.

Technical control Taking the concrete samples These are the samples

The roof of the basement is finished and ready for pouring the concrete. The man below is controlling the flow speed of the concrete by remote control and is being directed by the builder who is pouring the roof.

builders-lanzarote-41.jpg The roof is ready for the concrete The man in controll of the concrete pump

The roof has taken 50 cubic metres of concrete to cover and will only take a few hours to go off.

The first blocks are being laid for the first floor of the villa.

Builders Lanzarote Natura Design The first blocks are laid

Builders Lanzarote

Lanzarote builders - New villa update for Playa Blanca

The acro props have been put into position to support the main structure of the ceiling of the basement.

lanzarote-builders09.JPG Natura design Lanzarote builders Shuttering for the roof

All the ceiling blocks are in place. We will finish the final steel work on Monday morning ready for pouring the concrete for the roof. This will be the first stage of the major construction work completed.

Building the ceiling Lanzarote builders builders lanzarote

Natura Design - Starting to shutter for the basement ceiling.

We have started to put up the shuttering to support the ceiling

Lanzarote Builders Shuttering for the ceiling Natura Design

The preparation for the screeding of the second villas floor

Floor screeding copy-of-hitesh-9-005.jpg Backfilled the site

The site has been backfilled and the land has been levelled

copy-of-hitesh-9-008.jpg Ground is levelled Building the retaining walls

Lanzarote builders

Lanzarote builders Playa Blanca Update

Today we are pouring the final concrete for the completion of the basement walls for the second villa. We will also pour all the supporting columns for the first storey. The technical control and quality control technicians visited the site this morning and gave us the ok to pour the concrete.

Natura Design Lanzarote Builders Pouring the concrete

We have started to backfill the supporting walls. These were first damp-proofed with pitch paint and a special plastic membrane to keep out the water.

Martin Shuttering Concrete lorry

The majority of work is now completed on both of these basements. All the shuttering and cardboard columns have been removed and the concrete floor had been laid. We are now preparing the ramp down to the underground car park.

Natura Design Lanzarote builders The wall are finished Floor is laid

I am pleased with our progress so far, everything has gone smoothly and we are on schedule.

Lanzarote Builders.

Playa blanca build starts to take shape

Things are starting to take shape.

We have finished the foundations on the second villa. The concrete has been poured, levelled and then vibrated to take out any air bubbles.

Pouring the foundations The finished foundations Vibrating the concrete
60 cubic metres of concrete have gone into the foundations, 8 lorry loads.

Concrete delivery copy-of-hitesh-7-025.jpg Natura Design

The last section of the basement walls have been poured along with the pillars and columns.

Shuttering panels Natura Design Builders Lanzarote

We use a cardboard shuttering for the columns which is removed after 24 hours.

Vibrating the concrete Lanzarote builders The walls are finished

The basement walls on the first villa are completed and we are moving the shuttering to the second site.

Walls are up Moving the shuttering Shuttering

Playa Blanca construction update

The concrete lorry and concrete pump have arrived to start the first section of wall for the basement. We have started with a twenty six metre section of shuttering. The panels are painted with a product to stop them sticking to the cement. The site has been inspected by Applus the technical control company for the seguro decenal and the quality control have taken the concrete samples they need.

Natura design Pumping the concrete Painting the shuttering to stop it sticking

We have now removed the shuttering ready for the next section of wall.

Builders lanzarote lanzarote A finished section of wall

The block work and steel are now finished for the second villa. The concrete will be poured early next week next after the electrician has soldered the copper wire for the earth.

Builders lanzarote

Playa Blanca - The foundations

The steel work is nearly complete and ready for the concrete to be poured on Monday morning. I have had site meeting with the surveyor (aparejador) Mª­ Angeles Pazos Agüera, (she also works for the Arrecife council) on Friday morning we went through the plans and was happy with the changes we made. The technical control company APPLUS also checked the site on Wednesday and signed the first paper in regards to the Insurance (seguro decenal). Both companies plus the quality control company ( Consultores Canarios control de calidad y asistencia tecnica) will return Monday morning for the final check before the concrete is poured.

hitesh-3-022.jpg hitesh-3-027.jpg Biulding the foundations

Natura design foundations Natura design

|