All the acro props have been removed bar a few and we have started to chop out the walls for the electrical conduits.

The Lounge                      The Kitchen

natura-design-lanzarote7.jpg   natura-design-lanzarote3.jpg  Electical conduit

The View from the Kitchen into the sitting room.

natura-design-lanzarote5.jpg

The view from the lounge into the Kitchen.

natura-design-lanzarote8.jpg

Carpentry by Natura Design

This is a semi shaded Pergola which when completed will have three sliding aluminium louvered  sections to supply shade when required.

Before  carpentry-by-natura-design0101.jpg  After

Made from top quality materials it has been waterproofed with three coats of Bondex, one of Macassar Mate and two of Macassar Satinado and sanded with a fine wet and dry sandpaper between each coat. The roof was then waterproofed by using fibreglass and rubber paint.Natura Design pergola  Carpentry by Natura Design  Carpentry by Natura Design

We will be installing the roof panels in the next few weeks and Sol Y Sombra from Tias will be supplying roll-down wind breaks for one side.

Infinity Pool by Natura Design

The main pool structure is finished and the pipe work is now installed.

Infinity pool Stone facing Screeding finished

The pool has been rendered and the fibergless finished.

infinity-pool-by-natura-design-7.jpg infinity-pool-by-natura-design-5.jpg Tiling the pool area

Builders Lanzarote - Playa Blanca villas

Both Villas are now roofed , the final blocks are being placed on the roof of the second villa and we will be ready for pouring the concrete in the next couple of days.

 Villa built by Natura Design

Natura Design Lanzarote builders Villa built by Natura Design

Lanzarote builders New Villas

Playa Blanca update

Quality control department checking the project with his new car.

New Site Foreman   Franks new car

Roof for the first villa just before pouring the concrete. All the acro props are in place and the steel work has been checked by the quality control.

hitesh-13-001.jpg  hitesh-13-008.jpg  hitesh-13-010.jpg 

Roof has been poured and the block work for the second villa is up to roof height.

The villas are really now starting to take shape.

hitesh-13-012.jpg  hitesh-13-021.jpg  Natura Design

Builders Lanzarote - New villa construction.

We have now started to lay the blocks for the first villa and it is starting to take shape.

Builders Lanzarote Natura Design New Villa build by Natura Design

This is the view from the back of the villa where you can see the shapes of the rooms.

Lanzarote builders natura-design-lanzarote-builders0105.jpg

Lanzarote Builders - Playa Blanca, roofing the sotano.

Natura design. Lanzarote builders of Luxury villas and custom built swimming pools.

The floors are being laid for the second villa’s basement and the water tanks are now finished.
builders-lanzarote.jpg Natura Design Water Tanks

This is the technical control checking the steel work for the roof and also taking samples of the concrete which they take back to the lab to check the quality. They follow the build from start to finish making sure the project is built exactly according to the plans and the quality of the materials used are of European standard for the seguro decenal.

Technical control Taking the concrete samples These are the samples

The roof of the basement is finished and ready for pouring the concrete. The man below is controlling the flow speed of the concrete by remote control and is being directed by the builder who is pouring the roof.

builders-lanzarote-41.jpg The roof is ready for the concrete The man in controll of the concrete pump

The roof has taken 50 cubic metres of concrete to cover and will only take a few hours to go off.

The first blocks are being laid for the first floor of the villa.

Builders Lanzarote Natura Design The first blocks are laid

Builders Lanzarote

Lanzarote builders - New villa update for Playa Blanca

The acro props have been put into position to support the main structure of the ceiling of the basement.

lanzarote-builders09.JPG Natura design Lanzarote builders Shuttering for the roof

All the ceiling blocks are in place. We will finish the final steel work on Monday morning ready for pouring the concrete for the roof. This will be the first stage of the major construction work completed.

Building the ceiling Lanzarote builders builders lanzarote

Natura Design - Starting to shutter for the basement ceiling.

We have started to put up the shuttering to support the ceiling

Lanzarote Builders Shuttering for the ceiling Natura Design

The preparation for the screeding of the second villas floor

Floor screeding copy-of-hitesh-9-005.jpg Backfilled the site

The site has been backfilled and the land has been levelled

copy-of-hitesh-9-008.jpg Ground is levelled Building the retaining walls

Lanzarote builders

Lanzarote builders Playa Blanca Update

Today we are pouring the final concrete for the completion of the basement walls for the second villa. We will also pour all the supporting columns for the first storey. The technical control and quality control technicians visited the site this morning and gave us the ok to pour the concrete.

Natura Design Lanzarote Builders Pouring the concrete

We have started to backfill the supporting walls. These were first damp-proofed with pitch paint and a special plastic membrane to keep out the water.

Martin Shuttering Concrete lorry

The majority of work is now completed on both of these basements. All the shuttering and cardboard columns have been removed and the concrete floor had been laid. We are now preparing the ramp down to the underground car park.

Natura Design Lanzarote builders The wall are finished Floor is laid

I am pleased with our progress so far, everything has gone smoothly and we are on schedule.

Lanzarote Builders.