- Natura Design - Lanzarote Builders - Villas - Swimming Pools - http://blog.naturadesign.net -
Playa Blanca update
Posted By Martin Sargent On 03/09/2008 @ 10:39 am In Current construction projects, Client - Hitesh | No Comments
Quality control department checking the project with his new car.
Roof for the first villa just before pouring the concrete. All the acro props are in place and the steel work has been checked by the quality control.
Roof has been poured and the block work for the second villa is up to roof height.
The villas are really now starting to take shape.
Article printed from Natura Design - Lanzarote Builders - Villas - Swimming Pools: http://blog.naturadesign.net
URL to article: http://blog.naturadesign.net/2008/09/03/playa-blanca-update/
URLs in this post:
[1] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/09/hitesh.jpg
[2] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/09/hitesh-13-017.jpg
[3] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/09/hitesh-13-001.jpg
[4] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/09/hitesh-13-008.jpg
[5] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/09/hitesh-13-010.jpg
[6] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/09/hitesh-13-012.jpg
[7] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/09/hitesh-13-021.jpg
[8] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/09/hitesh-13-022.jpg
Click here to print.