You are currently browsing the Natura Design - Lanzarote Builders - Villas - Swimming Pools weblog archives for September, 2008.
30/09/2008 by Martin Sargent.
This is a semi shaded Pergola which when completed will have three sliding aluminium louvered sections to supply shade when required.
Made from top quality materials it has been waterproofed with three coats of Bondex, one of Macassar Mate and two of Macassar Satinado and sanded with a fine wet and dry sandpaper between each coat. The roof was then waterproofed by using fibreglass and rubber paint.
![]()
We will be installing the roof panels in the next few weeks and Sol Y Sombra from Tias will be supplying roll-down wind breaks for one side.
Posted in Carpentry by Natura Design, Current construction projects | Print | No Comments »
19/09/2008 by Martin Sargent.
The main pool structure is finished and the pipe work is now installed.
The pool has been rendered and the fibergless finished.
Posted in Pools - Under Construction, Client - Sue | Print | No Comments »
17/09/2008 by Martin Sargent.
Both Villas are now roofed , the final blocks are being placed on the roof of the second villa and we will be ready for pouring the concrete in the next couple of days.
Posted in Current construction projects, Client - Hitesh | Print | No Comments »
03/09/2008 by Martin Sargent.
Quality control department checking the project with his new car.
Roof for the first villa just before pouring the concrete. All the acro props are in place and the steel work has been checked by the quality control.
Roof has been poured and the block work for the second villa is up to roof height.
The villas are really now starting to take shape.
Posted in Current construction projects, Client - Hitesh | Print | No Comments »