Lanzarote builders - New villa update for Playa Blanca

Posted By Martin Sargent On 01/06/2008 @ 04:18 pm In Current construction projects, Client - Hitesh | No Comments

The acro props have been put into position to support the main structure of the ceiling of the basement.

[1] lanzarote-builders09.JPG [2] Natura design Lanzarote builders [3] Shuttering for the roof

All the ceiling blocks are in place. We will finish the final steel work on Monday morning ready for pouring the concrete for the roof. This will be the first stage of the major construction work completed.

[4] Building the ceiling [5] Lanzarote builders [6] builders lanzarote


Article printed from Natura Design - Lanzarote Builders - Villas - Swimming Pools: http://blog.naturadesign.net

URL to article: http://blog.naturadesign.net/2008/06/01/lanzarote-builders-new-villa-update-for-playa-blanca/

URLs in this post:
[1] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/06/lanzarote-builders09.JPG
[2] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/06/lanzarote-builders12.JPG
[3] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/06/lanzarote-builders20.JPG
[4] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/06/lanzarote-builders23.jpg
[5] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/06/lanzarote-builders29.jpg
[6] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/06/lanzarote-builders24.jpg

Click here to print.