The acro props have been put into position to support the main structure of the ceiling of the basement.
All the ceiling blocks are in place. We will finish the final steel work on Monday morning ready for pouring the concrete for the roof. This will be the first stage of the major construction work completed.
Article printed from Natura Design - Lanzarote Builders - Villas - Swimming Pools: http://blog.naturadesign.net
URL to article: http://blog.naturadesign.net/2008/06/01/lanzarote-builders-new-villa-update-for-playa-blanca/
URLs in this post:
[1] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/06/lanzarote-builders09.JPG
[2] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/06/lanzarote-builders12.JPG
[3] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/06/lanzarote-builders20.JPG
[4] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/06/lanzarote-builders23.jpg
[5] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/06/lanzarote-builders29.jpg
[6] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/06/lanzarote-builders24.jpg
Click here to print.