Natura Design - Starting to shutter for the basement ceiling.
We have started to put up the shuttering to support the ceiling

The preparation for the screeding of the second villas floor

The site has been backfilled and the land has been levelled

Lanzarote builders
This entry was posted on 24/05/2008 at 10:34 am and is filed under Current construction projects, Client - Hitesh. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response or trackback from your own site.