Playa blanca build starts to take shape

Things are starting to take shape.

We have finished the foundations on the second villa. The concrete has been poured, levelled and then vibrated to take out any air bubbles.

Pouring the foundations The finished foundations Vibrating the concrete
60 cubic metres of concrete have gone into the foundations, 8 lorry loads.

Concrete delivery copy-of-hitesh-7-025.jpg Natura Design

The last section of the basement walls have been poured along with the pillars and columns.

Shuttering panels Natura Design Builders Lanzarote

We use a cardboard shuttering for the columns which is removed after 24 hours.

Vibrating the concrete Lanzarote builders The walls are finished

The basement walls on the first villa are completed and we are moving the shuttering to the second site.

Walls are up Moving the shuttering Shuttering

|