Playa Blanca - The foundations

Posted By Martin Sargent On 19/04/2008 @ 04:59 am In Current construction projects, Client - Hitesh | No Comments

The steel work is nearly complete and ready for the concrete to be poured on Monday morning. I have had site meeting with the surveyor (aparejador) Mª­ Angeles Pazos Agüera, (she also works for the Arrecife council) on Friday morning we went through the plans and was happy with the changes we made. The technical control company APPLUS also checked the site on Wednesday and signed the first paper in regards to the Insurance (seguro decenal). Both companies plus the quality control company ( Consultores Canarios control de calidad y asistencia tecnica) will return Monday morning for the final check before the concrete is poured.

[1] hitesh-3-022.jpg [2] hitesh-3-027.jpg [3] Biulding the foundations

[4] Natura design [5] foundations [6] Natura design


Article printed from Natura Design - Lanzarote Builders - Villas - Swimming Pools: http://blog.naturadesign.net

URL to article: http://blog.naturadesign.net/2008/04/19/playa-blanca-the-foundations/

URLs in this post:
[1] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/04/hitesh-3-022.jpg
[2] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/04/hitesh-3-027.jpg
[3] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/04/hitesh-3-024.jpg
[4] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/04/hitesh-3-031.jpg
[5] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/04/hitesh-3-032.jpg
[6] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/04/hitesh-3-035.jpg

Click here to print.