Preparing the site
Posted By Martin Sargent On 10/04/2008 @ 07:16 pm In Client - Hitesh | No Comments
We have installed the electrical boxes ready for Unelco to supply electricity for the site.
We have completed the excavation on both plots of land for the aljibe (water tank) and the waste tank.
All tools and machinery have been delivered to the site and we will start on the foundations tomorrow.
Click on photos to enlarge them
Article printed from Natura Design - Lanzarote Builders - Villas - Swimming Pools: http://blog.naturadesign.net
URL to article: http://blog.naturadesign.net/2008/04/10/preparing-the-site/
URLs in this post:
[1] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/04/hitesh-1-001-resized2.jp
g
[2] : http://blog.naturadesign.net/__oneclick_uploads/2008/04/hitesh-1-001-resized2.jp
g
[3] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/04/hitesh-1-001-resized10.j
pg
[4] : http://blog.naturadesign.net/__oneclick_uploads/2008/04/hitesh-1-001-resized2.jp
g
[5] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/04/hitesh-1-001-resized9.jp
g
[6] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/04/hitesh-1-001-resized5.jp
g
[7] Image: http://blog.naturadesign.net/__oneclick_uploads/2008/04/hitesh-1-001-resized8.jp
g
Click here to print.