Pool full of water

The swimming pool has been topped up, the fountain works very well and all the pool lights are now working.

Pool heat pump swimming pool by Natura design pool water feature

I have moved the Heat pump and we are running the final checks for everything.

Swimming Pool Finished

The pool is now finished and we are starting to fill it with water. The filter has been filled with sand and we have plumbed in the heat pump leaving plenty of long lengths of tubing for the future instillation of a salt chlorinator. The electrician will finish off on Monday morning and i am getting him to put the light switch in the sitting room, to turn on the new outside lights, that the ones next to the BBQ, the spots and the lower wall lighting, there is room for one more switch next to the existing one.

filling the pool with water re12.jpg the finished pool

re10.jpg Tiled water line resi20.jpg

resized13.jpg resi4.jpg resi12.jpg

resi2.jpg resized3.jpg The heat pump

Pool and patio area re131.jpg re7.jpg


Fibreglassing of the swimming pool

The glassing is now finished.

We will tile the pool edge tomorrow and I will start to fill the swimming pool with water this weekend I will also Install the heat pump.

The ramp to the garage is also finished.

The non slip is on all steps and swimming pool surround.

aa14.jpg pool steps aa16.jpg

aa6.jpg

Starting to fiberglass the pool

The first coat of resin has been rollered on the swimming pool

fiberglassing the pool

We are about to concrete the driveway entrance