We have taken down the wall to allow access for the excavation of the pool, I have also had a site meeting with Teodoro the digger driver and he will excavate the site on Friday.
This entry was posted on 11/07/2007 at 07:44 pm and is filed under Client - Ron. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response or trackback from your own site.